Application Details

Particulars of the application

Application Number:

17/0870

Proposal:

Planning application for two replacement wider bridges over the M6 Motorway and a package of highway improvements comprising, enhanced motorway slip roads, installation of traffic signals, widening of the Junction of A454 and Tempus Drive Bloxwich Lane, modifications to the Black Country Route, landscape works and associated infrastructure and engineering works.

Site Address:

JUNCTION 10, M6 MOTORWAY, WALSALL, WEST MIDLANDS.

Application Type:

Environmental Statement and Planning Application

Ward:

Pleck (pre May 2026 ward change) Birchills Leamore (pre May 2026 ward change) Bentley and Darlaston North (pre May 2026 ward change)

Application Stage

Stage:

Registered Application

Comment on this application

Comment:

The application has been determined and you can no longer make comments on this application

Application dates

Valid Date:

25-Aug-2017

Proposed Committee Date:

22-Mar-2018

Target Date for Decision:

14-Dec-2017

Agreed Extension of Time:

08-May-2018

Decision Date:

08-May-2018

Decision Despatched:

08-May-2018 

Decision of the Council

Decision:

Grant Permission Subject to Conditions 

Planning Officer

Case Officer:

Andrew White

Applicant Details

Full Name or Company Name:

Walsall Council 

Company Contact Name:

Matt Crowton 

Address:

C/O Lapworth Architects Limited, 3 Silver Birches, Hinkshay Road, Hincks Hay, Telford, TF4 3PP 

Agent Details

Full Name or Company Name:

Mott MacDonald 

Company Contact Name:

Paul Ellingham 

Address:

35, Newhall Street, Birmingham, B3 3PU 

Decision Details

Decision:

Grant Permission Subject to Conditions 

Decision Category:

Permission Granted 

Decision Date:

08-May-2018 

Publicity Details

Publicity Start Date:

07-Sep-2017 

Publicity End Date:

 

Conditions and or Reasons


** Click on the document name to view the document**

Type Document
View_Application_Online_Link.pdf
Application_Form_25-08-17.pdf
Cover_Letter_25-08-17.pdf
Environmental_Statement_-_Figures_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Conclusions_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Cumulative_Effects_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Design_Development_Alternatives_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_EIA_Methodology_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Introduction_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Materials_and_Waste_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Nature_Conservation_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Noise_and_Vibration_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_The_Site_and_The_Scheme_25-08-17.pdf
Environmental_Statement_-_Main_Statement_-_Visual_Impact_25-08-17.pdf
Environmental_Statement_-_Non-Technical_Summary_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_Air_Quality_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_EIA_Methodology_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_Introduction_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_Materials_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_Nature_Conservation_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_Noise_and_Vibration_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_Site_and_Scheme_25-08-17.pdf
Environmental_Statement_-_Technical_Appendices_-_Visual_Impact_25-08-17.pdf
ES_-_Technical_Appendices_-_Design_Development_Alternatives_25-08-17.pdf
Plans_and_Drawings_-_Existing_Site_Plan_25-08-17.pdf
Plans_and_Drawings_-_Landscaping_-_Photomontages_-_25-08-17.pdf
Plans_and_Drawings_-_Landscaping_-_Planting_plans_25-08-17.pdf
Plans_and_Drawings_-_Layout_Plan_-_25-08-17.pdf
Plans_and_Drawings_-_Pedestrian_and_Cycle_Routes_25-08-17.pdf
Plans_and_Drawings_-_Planning_Application_Detail_Plan_25-08-17.pdf
Plans_and_Drawings_-_Site_Clearance_Plan_25-08-17.pdf
Plans_and_Drawings_-_Site_Location_Plan_25-08-17.pdf
Plans_and_Drawings_-_Typical_Section_Layout_Plan-_25-08-17.pdf
Plans_and_Drawings_-_Typical_Sections_25-08-17.pdf
Supporting_Documents_-_Arboricultural_Report_25-08-17.pdf
Supporting_Documents_-_Climate_Change_Risk_Assessment_25-08-17.pdf
Supporting_Documents_-_Construction_Management_Strategy_25-08-17.pdf
Supporting_Documents_-_Design_and_Access_Statement_25-08-17.pdf
Supporting_Documents_-_Flood_Risk_Assessment_25-08-17.pdf
Supporting_Documents_-_Health_Impact_Assessment_25-08-17.pdf
Supporting_Documents_-_Heritage_Statement_25-08-17.pdf
Supporting_Documents_-_Planning_Statement_25-08-17.pdf
Supporting_Documents_-_Statement_of_Community_Involvement_25-08-17.pdf
Supporting_Documents_-_Water_Quality_Report_25-08-17.pdf
Mining_Risk_Assessment_07-11-17.pdf
Mining_Risk_Assessment_Map_1_07-11-17.pdf
Mining_Risk_Assessment_Map_2_All_Source_Data_07-11-17.pdf
Mining_Risk_Assessment_Map_3_07-11-17.pdf
Mining_Risk_Assessment_Map_4_07-11-17.pdf
Mining_Risk_Assessment_Map_4a_Bottom_Coal_Workings_07-11-17.pdf
Mining_Risk_Assessment_Map_4a_Rough_Hill_White_Ironstone_Workings_07-11-17.pdf
Mining_Risk_Assessment_Map_4c_Blue_Flats_Ironstone_Workings_07-11-17.pdf
Mining_Risk_Assessment_Map_4d_Silverthread_Ironstone_and_Diamonds_Ironstone_Workings_07-11-17.pdf
Environmental_Statement_Addendum_18-12-17.pdf
Existing_Site_Plan_18-12-17.pdf
Pedestrian_and_Cycle_Routes_18-12-17.pdf
Site_Clearance_Plan_18-12-17.pdf
Planning_Application_Detail_Plan_V2_18-12-17.pdf
Site_Location_Plan_V2_18-12-17.pdf
M6_J10_-_Technical_Note_-_Pollution_Control_Response.pdf
j10_dn.pdf
J10decision.pdf
J10.pdf
17-0870.pdf
Annex_A_-_Environmental_Incident_Report_Form_14-01-20.pdf
Annex_B_-_Site_Energy_Management_Plan_Template_14-01-20.pdf
Annex_C_-_Environmental_Audit_Template_14-01-20.pdf
Annex_D_-_Pollution_Incident_Response_Plan_14-01-20.pdf
Annex_E_-_Weekly_Environmental_Checklist_14-01-20.pdf
Annex_F_-_Invasive_Plant_Method_Statement_14-01-20.pdf
Annex_G_-_Arboricultural_Report_14-01-20.pdf
Application_Form_14-01-20.pdf
Construction_Environmental_Management_Plan_14-01-20.pdf
Covering_Letter_14-01-20.pdf
Traffic_Management_Plan_14-01-20.pdf
Vegetation_Clearance_-_Sheet_1_of_2_-_1_14-01-20.pdf
Vegetation_Clearance_-_Sheet_1_of_2_-_2_14-01-20.pdf
Vegetation_Clearance_-_Sheet_1_of_2_-_3_14-01-20.pdf
Vegetation_Clearance_-_Sheet_2_of_2_-_1_14-01-20.pdf
Vegetation_Clearance_-_Sheet_2_of_2_-_2_14-01-20.pdf
Vegetation_Clearance_-_Sheet_2_of_2_-_3_14-01-20.pdf
Vegetation_Site_Clearance_Specification_14-01-20.pdf
Ecology.pdf
452_Wolverhampton_Road_-_Sitecheck_Datasheet_20-02-20.pdf
Application_Form_20-02-20.pdf
Condition_Discharge_Commentary_20-02-20.pdf
Land_at_Village_Hotel_-_Sitecheck_Datasheet_20-02-20.pdf
Main_Compound_-_Site_Layout_20-02-20.pdf
Main_Compound_-_Vehicle_Tracking_Sheet_1_20-02-20.pdf
Main_Compound_-_Vehicle_Tracking_Sheet_2_20-02-20.pdf
Main_Compound_-_Visibility_Splay_1_20-02-20.pdf
Main_Compound_-_Visibility_Splay_2_20-02-20.pdf
Site_Compound_Review_20-02-20.pdf
Temporary_Compound_-_Site_Layout_20-02-20.pdf
Temporary_Compound_-_Vehicle_Tracking_20-02-20.pdf
Construction_Environmental_Management_Plan_14-01-20.pdf
Application_Form_24-03-20.pdf
Approval_in_Principle_-_Proposed_Culvert_Extension_24-03-20.pdf
Condition_1_Discharge_24-03-20.pdf
Condition_8_Discharge_24-03-20.pdf
Condition_Survey_Email_24-03-20.pdf
CRT_Email_24-03-20.pdf
Photographic_Dilapidation_Survey_24-03-20.pdf
Proposed_Culvert_Extension_General_Arrangement_24-03-20.pdf
Application_Form_07-05-20.pdf
Black_Country_Route_General_Arrangement_Sheet_1_of_2_07-05-20.pdf
Black_Country_Route_General_Arrangement_Sheet_2_of_2_07-05-20.pdf
Black_Country_Route_Highways_General_Arrangement_Sheet_1_of_2_07-05-20.pdf
Black_Country_Route_Highways_General_Arrangement_Sheet_2_of_2_07-05-20.pdf
Black_Country_Route_Kerbs_and_Footways_Sheet_1_of_2_07-05-20.pdf
Black_Country_Route_Kerbs_and_Footways_Sheet_2_of_2_07-05-20.pdf
Conditon_11_Supporting_Narrative_07-05-20.pdf
Conditon_2_Supporting_Narrative_07-05-20.pdf
Diagrammatical_Landscape_Sections_-_Sheet_1_of_3_07-05-20.pdf
Diagrammatical_Landscape_Sections_-_Sheet_2_of_3_07-05-20.pdf
Diagrammatical_Landscape_Sections_-_Sheet_3_of_3_07-05-20.pdf
Drainage_Design_Base_Statement_07-05-20.pdf
General_Scheme_Wide_Location_Plan_07-05-20.pdf
Jct_10_Roundabout_General_Arrangement_07-05-20.pdf
Jct_10_Roundabout_Highways_General_Arrangement_07-05-20.pdf
Jct_10_Roundabout_Kerbs_and_Footways_07-05-20.pdf
M6_Mainline_General_Arrangement_Sheet_1_of_2_07-05-20.pdf
M6_Mainline_General_Arrangement_Sheet_2_of_2_07-05-20.pdf
M6_Mainline_Highways_General_Arrangement_Sheet_1_of_2_07-05-20.pdf
M6_Mainline_Highways_General_Arrangement_Sheet_2_of_2_07-05-20.pdf
M6_Mainline_Kerbs_and_Footways_Sheet_1_of_2_07-05-20.pdf
M6_Mainline_Kerbs_and_Footways_Sheet_2_of_2_07-05-20.pdf
Pavement_Details_07-05-20.pdf
Planting_Plan_01_-_Sheet_2_of_4_07-05-20.pdf
Planting_Plan_02_-_Sheet_3_of_4_07-05-20.pdf
Planting_Plan_03_-_Sheet_4_of_4_07-05-20.pdf
Wolverhampton_Road_General_Arrangement_07-05-20.pdf
Wolverhampton_Road_Highways_General_Arrangement_07-05-20.pdf
Wolverhampton_Road_Kerbs_and_Footways_07-05-20.pdf
Application_Form_11-05-20.pdf
Approval_in_Principle_Design_-_North_and_South_Bridge_11-05-20.pdf
Black_Country_Route_General_Arrangement_Sheet_1_of_2_11-05-20.pdf
Black_Country_Route_General_Arrangement_Sheet_2_of_2_11-05-20.pdf
Black_Country_Route_Highways_General_Arrangement_Sheet_1_of_2_11-05-20.pdf
Black_Country_Route_Highways_General_Arrangement_Sheet_2_of_2_11-05-20.pdf
Black_Country_Route_Isopachyte-Existing_Carriageway_Extents_-_Sheet_1_of_2_11-05-20.pdf
Black_Country_Route_Isopachyte-Existing_Carriageway_Extents_-_Sheet_2_of_2_11-05-20.pdf
Black_Country_Route_Kerbs_and_Footways_Sheet_1_of_2_11-05-20.pdf
Black_Country_Route_Kerbs_and_Footways_Sheet_2_of_2_11-05-20.pdf
Black_Country_Route_Proposed_Traffic_Sign_Locations_-_Sheet_1_of_2_11-05-20.pdf
Black_Country_Route_Proposed_Traffic_Sign_Locations_-_Sheet_2_of_2_11-05-20.pdf
Condition_15_Cover_Letter_11-05-20.pdf
Design_Base_Statement_-_Lighting_Design_11-05-20.pdf
Gantry_Location_Plan_11-05-20.pdf
Gantry_Structure_General_Arrangement_11-05-20.pdf
Idealised_Diagram_for_Structure_Analysis_11-05-20.pdf
Jct_10_Roundabout_General_Arrangement_11-05-20.pdf
Jct_10_Roundabout_Highways_General_Arrangement_11-05-20.pdf
Jct_10_Roundabout_Isopachyte-Existing_Carriageway_Extents_11-05-20.pdf
Jct_10_Roundabout_Proposed_Traffic_Sign_Locations_11-05-20.pdf
Jct_10_Roundabout_Route_Kerbs_and_Footways_11-05-20.pdf
Kerbs,_Footways_and_Paved_Areas_Standard_Details_11-05-20.pdf
M6_Mainline_General_Arrangement_Sheet_1_of_2_11-05-20.pdf
M6_Mainline_General_Arrangement_Sheet_2_of_2_11-05-20.pdf
M6_Mainline_Highways_General_Arrangement_Sheet_1_of_2_11-05-20.pdf
M6_Mainline_Highways_General_Arrangement_Sheet_2_of_2_11-05-20.pdf
M6_Mainline_Isopachyte-Existing_Carriageway_Extents_-_Sheet_1_of_2_11-05-20.pdf
M6_Mainline_Isopachyte-Existing_Carriageway_Extents_-_Sheet_2_of_2_11-05-20.pdf
M6_Mainline_Proposed_Traffic_Sign_Locations_-_Sheet_1_of_2_11-05-20.pdf
M6_Mainline_Proposed_Traffic_Sign_Locations_-_Sheet_2_of_2_11-05-20.pdf
M6_Mainline_Route_Kerbs_and_Footways_Sheet_1_of_2_11-05-20.pdf
M6_Mainline_Route_Kerbs_and_Footways_Sheet_2_of_2_11-05-20.pdf
M6_Slip_Road_Typical_Sections_-_Sheet_1_of_4_11-05-20.pdf
M6_Slip_Road_Typical_Sections_-_Sheet_2_of_4_11-05-20.pdf
M6_Slip_Road_Typical_Sections_-_Sheet_3_of_4_11-05-20.pdf
M6_Slip_Road_Typical_Sections_-_Sheet_4_of_4_11-05-20.pdf
North_Bridge_Bearing_Articulation_11-05-20.pdf
North_Bridge_General_Arrangement_-_Sheet_1_of_2_11-05-20.pdf
North_Bridge_General_Arrangement_-_Sheet_2_of_2_11-05-20.pdf
North_East_Retaining_Walls_-_North_and_South_Elevation_and_Section_11-05-20.pdf
North_West_and_South_West_Retaining_Walls_Elevation_and_Section_11-05-20.pdf
Pavement_Details_11-05-20.pdf
Proposed_Traffic_Sign_Faces_-_Sheet_1_of_5_11-05-20.pdf
Proposed_Traffic_Sign_Faces_-_Sheet_2_of_5_11-05-20.pdf
Proposed_Traffic_Sign_Faces_-_Sheet_3_of_5_11-05-20.pdf
Proposed_Traffic_Sign_Faces_-_Sheet_4_of_5_11-05-20.pdf
Proposed_Traffic_Sign_Faces_-_Sheet_5_of_5_11-05-20.pdf
Retaining_Wall_North_East_Plan_View_11-05-20.pdf
Retaining_Walls_Layout_Plan_View_11-05-20.pdf
South_Bridge_Bearing_Articulation_11-05-20.pdf
South_Bridge_General_Arrangement_-_Sheet_1_of_2_11-05-20.pdf
South_Bridge_General_Arrangement_-_Sheet_2_of_2_11-05-20.pdf
South_East_Retaining_Walls_Elevation_and_Section_11-05-20.pdf
Wolverhampton_Road_General_Arrangement_11-05-20.pdf
Wolverhampton_Road_Highways_General_Arrangement_11-05-20.pdf
Wolverhampton_Road_Isopachyte-Existing_Carriageway_Extents_11-05-20.pdf
Wolverhampton_Road_Proposed_Traffic_Sign_Locations_11-05-20.pdf
Wolverhampton_Road_Route_Kerbs_and_Footways_11-05-20.pdf
Application_Form_15-05-20.pdf
Black_Country_Route_Proposed_Drainage_Layout_15-05-20.pdf
Condition_9_Supporting_Narrative_15-05-20.pdf
Conditon_10_Supporting_Narrative_15-05-20.pdf
Contaminated_Land_Management_Plan_-_Document_1_15-05-20.pdf
Contaminated_Land_Management_Plan_-_Document_2_15-05-20.pdf
Roundabout_and_North_Facing_Slip_Roads_Proposed_Drainage_Layout_15-05-20.pdf
Roundabout_and_Wolverhampton_Road_Proposed_Drainage_Layout_15-05-20.pdf
South_Facing_Slip_Roads_Proposed_Drainage_Layout_15-05-20.pdf
1V1H_Steepened_Rs_Slope_At_Hp_Gas_General_Arrangement_18-05-20.pdf
Application_Form_18-05-20.pdf
Condition_14_Supporting_Narrative_18-05-20.pdf
Indicative_Section_18-05-20.pdf
RAMS_Template_18-05-20.pdf
Application_Form_19-05-20.pdf
Black_Country_Route_Highways_General_Arrangement_Sheet_1_of_2_19-05-20.pdf
Black_Country_Route_Highways_General_Arrangement_Sheet_2_of_2_19-05-20.pdf
Black_Country_Route_Pavement_PSV_Requirements_Sheet_1_of_2_19-05-20.pdf
Black_Country_Route_Pavement_PSV_Requirements_Sheet_2_of_2_19-05-20.pdf
Conditon_13_Supporting_Narrative_19-05-20.pdf
Jct_10_Roundabout_Pavement_PSV_Requirements_19-05-20.pdf
Jct_10_Roundabout_Road_Pavements_19-05-20.pdf
M6_Mainline_Highways_General_Arrangement_Sheet_1_of_2_19-05-20.pdf
M6_Mainline_Highways_General_Arrangement_Sheet_2_of_2_19-05-20.pdf
M6_Mainline_Pavement_PSV_Requirements_Sheet_1_of_2_19-05-20.pdf
M6_Mainline_Pavement_PSV_Requirements_Sheet_2_of_2_19-05-20.pdf
Pavement_Details_19-05-20.pdf
Planning_Application_Detail_Plan_Sheet_1_of_7_19-05-20.pdf
Planning_Application_Detail_Plan_Sheet_2_of_7_19-05-20.pdf
Pro-Acoustic_Data_Sheet_19-05-20.pdf
Series_Specification_Appendices_19-05-20.pdf
Wolverhampton_Road_Highways_General_Arrangement_19-05-20.pdf
Wolverhampton_Road_Pavement_PSV_Requirements_19-05-20.pdf
Application_Form_05-06-20.pdf
Condition_12_-_Covering_Letter_05-06-20.pdf
Landscape_and_Ecology_05-06-20_-_NOT_FOR_WEB.pdf
Planting_Plan_-_Sheet_1_of_4_-_HE551484_REV_P02_-_05-06-20.pdf
Planting_Plan_-_Sheet_2_of_4_-_HE551484_REV_P02_-_05-06-20.pdf
Planting_Plan_-_Sheet_3_of_4_-_HE551484_REV_P02_-_05-06-20.pdf
Planting_Plan_-_Sheet_4_of_4_-_HE551484_REV_P02_-_05-06-20.pdf
Ground_Investigation_Report_05-06-20.pdf
Decision_Notice.pdf
Application_Form_08-10-25.pdf
Drainage_Layout_North_of_Roundabout-05204-08-10-25.pdf
Drainage_Layout_Roundabout_-05208-08-10-25.pdf
Drainage_Layout_Roundabout_Black_Country_Route_-05201-08-10-25.pdf
Drainage_Layout_Roundabout_Black_Country_Route_-05202-08-10-25.pdf
Drainage_Layout_South_of_Roundabout-05205-08-10-25.pdf
Drainge_Layout_Wolverhampton_Rdoad_-05209-08-10-25.pdf
Hapas_Certificate_UitiPave_14-2023-08-10-25.pdf
Hapas_Certificate_VitiPave_10-2023-08-10-25.pdf
H052_ps1_UltrPave14-2023-_Certificate-10-12-25.pdf
HO52_ps_2_UitriPave_10-2023_Certificate_10-12-25.pdf
Application_Form_-09-12-25.pdf
HE551484-CPF-HFE-RBT-DR-CH-00011.pdf
HE551484-CPF-SGN-ZZZ-RP-CB-00001_signed.pdf
Pro-acoustic_Data_Sheet_29.pdf
 

Appeal Details

There are no appeals for this application

Legal Agreements

Amendments

HTS Name: wphappdetail-default.hts
Logical ID: WPHAPPDETAIL